Controls will be established to preclude the withdrawing of MTBSP data from other
than the particular headquarters' units affected. For example, a mobilization station
can only withdraw unit data on those units shown to be assigned to that installation as
a mobilization station. Instructions are contained in the hard copy document, Volume
II, MTBSP, FORMDEPS.
c. MTBSP DATA Guidelines. The MTBSP data is separated by columnar heading for
each unit listed beginning with the Unit Identification Code (UIC). Columns are
outlined for:
Troop Program Sequence Number - TPSN.
COMPONENT - COMPO.
A Name - Unit Narrative Name.
Standard Requirements Code - SRC.
Home Location - HOLOCATION.
Structure Strength, Offices and Warrant Offices - STRUCOW.
Structure Strength, Enlisted - STRUCE.
Mobilization Command - MBCMD.
Assignment - ASGMT.
Mobilization Location - MBLOCATION.
Packaging - PKG.
Coordinating Installation Location - CILOCATION.
Mobilization Date - MDATE.
Deployment Area - DP Area.
Mobilization Origin Departure Date - MOBDD.
Mobilization Station Arrival Date - MBSAD.
Ready to Load Date - RDYLD.
Estimated Departure Date Surface - EDDS.
Estimated Departure Date Air - EDDA.
Surface Latest Arrival Date - SLAD.
Air Latest Arrival Date - ALAD.
d. Units are grouped by component.